Electrical Load Management        Vanguard Marine Consulting 4 Mega yachts
                                                                                                         info@vmc4megayachts.com
 

 

 


Electrical load management based around PLC's allows the most efficient use of onboard and shore power.

This results in less black outs, switching generators, and loosing shore power during peak loadings.

Drawing on practical and programming experience from
Mari-Cha III over a 2 year period of de bugging and development in the field.
We can offer unprecedented advice for your project at the crucial design stage.

With extensive analysis at the design stage this can lead to smaller diesel generators, leading to considerable weight and space savings.

These systems are a must have on the modern sailing yachts, where electrical and hydraulic systems share a common diesel engine power source.
They provide automated control of electrical load shedding to reduce peak loads, and reduce the need to transfer some power to another generator, and also when hydraulic power is required.

With careful consideration and thorough analysis at the design stage these systems can easily be optimized for any size vessels overall power requirements, both electrical and hydraulic.


 

 

Home Profile Projects Links Contact
Back Next